● The replaceable units are not included in HUMMER-20KW. Reparation should be done
by local authorized installer.
● Connection of HUMMER-20KW to grid must be done after receiving prior approval from
Utility Company and can be only performed by professionals.
● Before connecting to the grid, keep the generator out of work or use other methods
which can prevent the output of generator to ensure safety from shock hazard. Because
when there is wind the wind turbine may rotate, and the wind generator will begin to
generating.
Warning: Make sure the AC Voltage is less than 280V; higher
voltage will damage HUMMER-20KW, and also will make the Warranty out
of effect.
Warning: All the repairs must be done by authorized personnel to
prevent voiding of warranty.
4. Products Introduction
4.1 Topology Description
PIC2 shows the whole HUMMER-20KW system including, inverter, unloader and wind
turbine. The wind generator will convert wind power into AC, which will be converted
into DC by the unloader; the inverter will convert DC into sustained AC to charge the
grid at last. With the advanced technology of IGBT and control processor,
HUMMER-20KW can work with higher power and charge voltage.